Logo
 
 
12/22/2024
 
 
 
 
 
By:G. R. Harper
Dates:7/13/2011 - 7/20/2011
Album Info:The switch to the Amtrak yard at Kemper Street Station in Lynchburg, VA, is re|laced.
  Page Controls   View:  Pics Per Page:
Cutting rail ahead of the old switch points while signal gang disconnects interlocking connections
Title:  Cutting rail ahead of the old switch points while signal gang disconnects interlocking connections
Description: 
Photo Date:  7/13/2011  Upload Date: 7/15/2011 1:42:24 AM
Location:  Lynchburg, VA
Author:  G. R. Harper
Categories: 
Locomotives: 
Views:  118   Comments: 0
The sparks fly as rail is cut while switch points are disassembled
Title:  The sparks fly as rail is cut while switch points are disassembled
Description: 
Photo Date:  7/13/2011  Upload Date: 7/15/2011 1:44:57 AM
Location:  Lynchburg, VA
Author:  G. R. Harper
Categories: 
Locomotives: 
Views:  109   Comments: 0
More sparks fly as the other rail ahead of the switch points is cut
Title:  More sparks fly as the other rail ahead of the switch points is cut
Description: 
Photo Date:  7/13/2011  Upload Date: 7/15/2011 1:47:32 AM
Location:  Lynchburg, VA
Author:  G. R. Harper
Categories: 
Locomotives: 
Views:  103   Comments: 0
Cutting the bolts off the time lock box
Title:  Cutting the bolts off the time lock box
Description: 
Photo Date:  7/13/2011  Upload Date: 7/15/2011 1:49:59 AM
Location:  Lynchburg, VA
Author:  G. R. Harper
Categories: 
Locomotives: 
Views:  126   Comments: 0
Time lock mechanism is carried off
Title:  Time lock mechanism is carried off
Description: 
Photo Date:  7/13/2011  Upload Date: 7/15/2011 1:52:41 AM
Location:  Lynchburg, VA
Author:  G. R. Harper
Categories: 
Locomotives: 
Views:  103   Comments: 0
A more precise cut is needed where the new switch frog panel will mate with existing main line rail.
Title:  A more precise cut is needed where the new switch frog panel will mate with existing main line rail.
Description: 
Photo Date:  7/13/2011  Upload Date: 7/15/2011 1:54:43 AM
Location:  Lynchburg, VA
Author:  G. R. Harpar
Categories: 
Locomotives: 
Views:  130   Comments: 0
Another rail is cut with the track saw
Title:  Another rail is cut with the track saw
Description: 
Photo Date:  7/13/2011  Upload Date: 7/15/2011 1:57:34 AM
Location:  Lynchburg, VA
Author:  G. R. Harper
Categories: 
Locomotives: 
Views:  91   Comments: 0
A gem of a crane lifts the old switch points
Title:  A gem of a crane lifts the old switch points
Description: 
Photo Date:  7/13/2011  Upload Date: 7/15/2011 2:02:23 AM
Location:  Lynchburg, VA
Author:  G. R. Harper
Categories:  RollingStock
Locomotives: 
Views:  238   Comments: 0
Old switch points are carried off as excavator cleans up the mess left behind
Title:  Old switch points are carried off as excavator cleans up the mess left behind
Description: 
Photo Date:  7/13/2011  Upload Date: 7/15/2011 2:05:09 AM
Location:  Lynchburg, VA
Author:  G. R. Harper
Categories: 
Locomotives: 
Views:  180   Comments: 0
Gap in the track where the old switch points once were
Title:  Gap in the track where the old switch points once were
Description: 
Photo Date:  7/13/2011  Upload Date: 7/15/2011 2:07:20 AM
Location:  Lynchburg, VA
Author:  G. R. Harper
Categories: 
Locomotives: 
Views:  112   Comments: 0
NW 514891 lifts the middle section of the old switch
Title:  NW 514891 lifts the middle section of the old switch
Description: 
Photo Date:  7/13/2011  Upload Date: 7/15/2011 2:09:25 AM
Location:  Lynchburg, VA
Author:  G. R. Harper
Categories:  RollingStock
Locomotives: 
Views:  165   Comments: 0
Mid section of old switch is taken away as excavator begins prep for new sectioos
Title:  Mid section of old switch is taken away as excavator begins prep for new sectioos
Description: 
Photo Date:  7/13/2011  Upload Date: 7/15/2011 2:11:53 AM
Location:  Lynchburg, VA
Author:  G. R. Harper
Categories: 
Locomotives: 
Views:  124   Comments: 0
Dozer lifts frog section of old switch prior to its removal
Title:  Dozer lifts frog section of old switch prior to its removal
Description: 
Photo Date:  7/13/2011  Upload Date: 7/15/2011 2:16:45 AM
Location:  Lynchburg, VA
Author:  G. R. Harper
Categories: 
Locomotives: 
Views:  149   Comments: 0
Frog portion of old switch is lifted off the ground
Title:  Frog portion of old switch is lifted off the ground
Description: 
Photo Date:  7/13/2011  Upload Date: 7/15/2011 2:18:43 AM
Location:  Lynchburg, VA
Author:  G. R. Harper
Categories:  RollingStock
Locomotives: 
Views:  134   Comments: 0
All of the old switch at MP 172.2 is gone
Title:  All of the old switch at MP 172.2 is gone
Description: 
Photo Date:  7/13/2011  Upload Date: 7/15/2011 2:21:07 AM
Location:  Lynchburg, VA
Author:  G. R. Harper
Categories: 
Locomotives: 
Views:  108   Comments: 0
The new frog section is delivered while the dozer continues to grade the roadbed
Title:  The new frog section is delivered while the dozer continues to grade the roadbed
Description: 
Photo Date:  7/13/2011  Upload Date: 7/15/2011 2:23:31 AM
Location:  Lynchburg, VA
Author:  G. R. Harper
Categories:  RollingStock
Locomotives: 
Views:  170   Comments: 0
NS train 213 roars past the work site
Title:  NS train 213 roars past the work site
Description: 
Photo Date:  7/13/2011  Upload Date: 7/15/2011 2:26:15 AM
Location:  Lynchburg, VA
Author:  G. R. Harper
Categories: 
Locomotives:  NS 8409(C40-8W) NS 9240(C40-9W)
Views:  199   Comments: 0
FedEx trailer on NS train 213 passes the worksite
Title:  FedEx trailer on NS train 213 passes the worksite
Description:  Signal Department is excavating very carefully for the cabme that interlocks the switch with the signal system
Photo Date:  7/13/2011  Upload Date: 7/15/2011 2:29:32 AM
Location:  Lynchburg, VA
Author:  G. R. Harper
Categories: 
Locomotives: 
Views:  1139   Comments: 0
Rear of NS train 213 passes the work site.
Title:  Rear of NS train 213 passes the work site.
Description: 
Photo Date:  7/13/2011  Upload Date: 7/15/2011 2:32:40 AM
Location:  Lynchburg, VA
Author:  G. R. Harper
Categories: 
Locomotives: 
Views:  118   Comments: 0
New frog section is lowered into place
Title:  New frog section is lowered into place
Description: 
Photo Date:  7/13/2011  Upload Date: 7/15/2011 2:34:49 AM
Location:  Lynchburg, VA
Author:  G. R. Harper
Categories:  RollingStock
Locomotives: 
Views:  151   Comments: 0
New frog section is eased into place
Title:  New frog section is eased into place
Description: 
Photo Date:  7/13/2011  Upload Date: 7/15/2011 2:37:05 AM
Location:  Lynchburg, VA
Author:  G. R. Harper
Categories:  RollingStock
Locomotives: 
Views:  120   Comments: 0
New frog is being attached to existing main line rail
Title:  New frog is being attached to existing main line rail
Description: 
Photo Date:  7/13/2011  Upload Date: 7/15/2011 2:39:18 AM
Location:  Lynchburg, VA
Author:  G. R. Harper
Categories: 
Locomotives: 
Views:  119   Comments: 0
Middle section of new switch is lowered into place.
Title:  Middle section of new switch is lowered into place.
Description: 
Photo Date:  7/13/2011  Upload Date: 7/15/2011 2:41:38 AM
Location:  Lynchburg, VA
Author:  G. R. Harper
Categories:  RollingStock
Locomotives: 
Views:  128   Comments: 0
Pieces of the old switch leading into the Amtrak/NS storage yard at Kemper Street Station on the ground awaiting disposal
Title:  Pieces of the old switch leading into the Amtrak/NS storage yard at Kemper Street Station on the ground awaiting disposal
Description: 
Photo Date:  7/13/2011  Upload Date: 7/15/2011 9:04:30 AM
Location:  Lynchburg, VA
Author:  G. R. Harper
Categories: 
Locomotives: 
Views:  105   Comments: 0
The other side of crane NW 514891 is on the sunny side in storage now!
Title:  The other side of crane NW 514891 is on the sunny side in storage now!
Description: 
Photo Date:  7/20/2011  Upload Date: 7/21/2011 10:43:00 AM
Location:  Lynchburg, VA
Author:  G. R. Harper
Categories:  RollingStock
Locomotives: 
Views:  142   Comments: 0


Site Design ©2001-2020 Tim Huemmer
Photos © respective authors
  Contact: info@rrpicturearchives.net