CB&Q SW1 9139         
Chicago Burlington & Quincy Railroad SW1 9139 at West Burlington, Iowa on September 26, 1965, Kodachrome by Chuck Zeiler. This locomotive was built by Electro-Motive Corporation, completed June 15, 1939 (c/n 900) on EMC Order E259, later became BN 84, was retired by the BN in November 1975, became Billings Grain 84, then PVGX 84. The blur in the foreground is whatever I was bracing the camera on for stabilization during a slow shutter exposure. West Burlington, Iowa on September 26, 1965, photo by Chuck Zeiler. This locomotive was built by Electro-Motive Corporation, completed June 15, 1939 (c/n 900) on EMC Order E259, later became BN 84, was retired by the BN in November 1975, became Billings Grain 84, then PVGX 84. The blur in the foreground is whatever I was bracing the camera on for stabilization during a slow shutter exposure.
Date: 9/26/1965 Location: West Burlington, IA Views: 1957 Collection Of:   Chuck Zeiler
Locomotives: CBQ 9139(SW1)    Author:  Chuck Zeiler
CB&Q SW1 9139
Picture Categories: Roster This picture is part of album:  CB&Q Diesel Switchers
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=1155813