080515004 New insulated rail joint installed at BNSF Northtown CTC 44th.
Rail joint is for new CTC crossover. Note temporary dual (redundant) rail bonds bypass the insulator until the trackwork is actually done
Date:
5/15/2008
Location:
Minneapolis, MN
Views:
348
Collection Of:
The Slidebroker image by John Hill
Author:
John Hill
Picture Categories: Yard,Track
This picture is part of album:
2008 Twin Cities Trackwork Projects
Share
User Comments
Contributor does not allow comments on their photos.
Link to this page:
http://www.rrpicturearchives.net/showPicture.aspx?id=1161604