5A (left) is nolonger used, but if 5 (right) breaks or is damaged in some way NS has it in their mind that they can rebuild the lead to 5A and have it operational within a few hours. |
Date:
7/12/2008 |
Location:
Norfolk, VA |
Views:
259 |
Collection Of:
William Grimes |
|
Author: William Grimes
|
|
Picture Categories: Bridge |
This picture is part of album: Virginia Depots |