Trackwork         
The rehab of 1 track and the siding between FB and XR interlockings is well under way. Here we see equipment parked near the signal at Hamilton.
Date: 12/13/2008 Location: Fredericksburg, VA Views: 126 Collection Of:   Kevin Olson
Author:  Kevin Olson
Trackwork
Picture Categories: This picture is part of album:  Christmas time on the RF&P
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=1424642