Roseville Job         
A little out of the ordinary for the Roseville job to come up to New Brighton, but odd moves do happen. Today the two GE's came up to pull 25 2-bay hoppers that were handed off early in the morning by the WC. But with only one engine on the 88 Job (the job that pulls the interchange), there wasn't enough power to take the extra 25, which is why this second move occured.
Date: 3/8/2009 Location: New Brighton, MN Views: 288 Collection Of:   SDfourD Photography
Locomotives: MNNR 68(B23-7)    Author:  Alec Holmes
Roseville Job
Picture Categories: This picture is part of album:  New Brighton 12 (CN,MNNR)
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=1518648