NS GP38-2 Hi-Hood 5180 (ex-Southern) leads the transfer with the Black River & Western, train H76, as a push-pull with Low-Hood GP38-2 5337 (PRR ex Conrail) on a sunny Sunday afternoon, Main Street, 1210 hours. Newly installed but non-operating signal for the to be built Stanton Station to Flemington Junction meeting siding can be seen behind signals 481 and 482. |