Flood damage
The results of 8 inches of rain in 8 hours on an already saturated landscape can be seen here. The railroad was acting as a dam until the steady erosion that water caused opened up a 6 foot wide breach under the track.
Date:
3/28/2009
Location:
Hilton, GA
Map
Views:
250
Collection Of:
Bryan Smith
Author:
Bryan Smith
Picture Categories:
This picture is part of album:
Georgia Railroading
Share
User Comments
No Comments on this picture
Add a Comment:
Please
Log in
to leave a Comment.
Link to this page:
http://www.rrpicturearchives.net/showPicture.aspx?id=1544621