Q 120 creeps by at 10 mph as the bridge foreman inspects the small portion yet to be finished. A retaining wall will be poured and then fill will be put in to finish the bridge project. |
Date:
4/16/2009 |
Location:
Vincennes, IN Map |
Views:
183 |
Collection Of:
Brian Vieck |
|
Author: Brian Vieck
|
|
Picture Categories: |
This picture is part of album: Replacing a bridge on CSX |