A fresh load of Powder River Basin coal for Alabama Power - Miller Steam Plant has just been dropped at Quinton Yard. RailConn crews take the controls at Quinton Yard and operate the trains around the unloading loop at the plant. The RailConn crews then turn things back over to BNSF at Quinton for the long trip back to the PRB. |
Date:
6/26/2009 |
Location:
West Jefferson, AL |
Views:
444 |
Collection Of:
Jeremy Cole |
Locomotives: |
Author: Jeremy Cole
|
|
Picture Categories: |
This picture is part of album: BNSF - Miller Steam Plant |