Autograph.
Late winter, early spring new crossing protection was installed here. Insulated rail joints were pre-built off site and then cut into the existing track, then welded.
Date:
8/22/2009
Location:
Everett, OH
Views:
105
Collection Of:
Fred Stuckmann
Author:
Fred Stuckmann
Picture Categories: Track
This picture is part of album:
Cuyahoga Valley Scenic Railway Indigo Lake
Share
User Comments
Contributor does not allow comments on their photos.
Link to this page:
http://www.rrpicturearchives.net/showPicture.aspx?id=1721013