090919032 BNSF ex-NP Raymond Ave Bridge Replacement Project On St. Paul Sub.         
Last look at old bridge while new span is being assembled on site to be slid laterally into postion with hydraulic pistons
Date: 9/19/2009 Location: Saint Paul, MN Views: 130 Collection Of:   The Slidebroker image by John Hill
Author:  John Hill
090919032 BNSF ex-NP Raymond Ave Bridge Replacement Project On St. Paul Sub.
Picture Categories: Bridge This picture is part of album:  2009 Twin Cities Trackwork Projects
Share
User Comments Contributor does not allow comments on their photos.
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=1766791