090919034 BNSF ex-NP Raymond Ave Bridge Replacement Project On St. Paul Sub.
New span is being assembled on site to be slid laterally into postion with hydraulic pistons
Date:
9/19/2009
Location:
Saint Paul, MN
Views:
103
Collection Of:
The Slidebroker image by John Hill
Author:
John Hill
Picture Categories: Bridge
This picture is part of album:
2009 Twin Cities Trackwork Projects
Share
User Comments
Contributor does not allow comments on their photos.
Link to this page:
http://www.rrpicturearchives.net/showPicture.aspx?id=1766792