090919035 BNSF ex-NP Raymond Ave Bridge Replacement Project On St. Paul Sub.         
New span is being assembled on site to be slid laterally into postion with hydraulic pistons
Date: 9/19/2009 Location: Saint Paul, MN Views: 97 Collection Of:   The Slidebroker image by John Hill
Author:  John Hill
090919035 BNSF ex-NP Raymond Ave Bridge Replacement Project On St. Paul Sub.
Picture Categories: Bridge This picture is part of album:  2009 Twin Cities Trackwork Projects
Share
User Comments Contributor does not allow comments on their photos.
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=1766793