Loading Rail
After the rail was hauled out of the abandonded siding it was loaded trailers or set aside for later use. Some was taken to High School Crossing.
Date:
7/25/2009
Location:
Ellsworth, ME
Views:
144
Collection Of:
David Larrabee
Author:
David Larrabee
Picture Categories: RollingStock,Yard,Track,Action
This picture is part of album:
Working on the Downeast Scenic RR
Share
User Comments
No Comments on this picture
Add a Comment:
Please
Log in
to leave a Comment.
Link to this page:
http://www.rrpicturearchives.net/showPicture.aspx?id=1770620