091024029 BNSF ex-NP Raymond Ave Bridge Replacement Project On St. Paul Sub.         
Old bridge was cut and dropped to road. New bridge was slid into place above while old span is being cut up for removal.
Date: 10/24/2009 Location: Saint Paul, MN Views: 127 Collection Of:   The Slidebroker image by John Hill
Author:  John Hill
091024029 BNSF ex-NP Raymond Ave Bridge Replacement Project On St. Paul Sub.
Picture Categories: Bridge This picture is part of album:  2009 Twin Cities Trackwork Projects
Share
User Comments Contributor does not allow comments on their photos.
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=1808313