The renovation of Nadrazi Cercany continued apace throughout 2009, and by the end of August the platforms were complete and Nastupiste (Platform) 2 was already operational, as seen here. The passenger subway wasnt open yet (notice the pedestrian crossing in the right background of this picture), as the concrete was still being poured and dried, and the canopy on the Nastupiste 1 still wasnt up. The track construction was looking quite good, though. |