EL mainline passed the structure to the left.
View is west. To the right, ore trains were transferred to the EL and empties were given back to the N&W. These moves were seasonal due to the Great Lakes freezing up.
Date:
5/8/2010
Location:
Creston, OH
Views:
127
Collection Of:
Fred Stuckmann
Author:
Fred Stuckmann
Picture Categories:
This picture is part of album:
EL Boneyard, Rittman to West Salem, revisited 2013.
Share
User Comments
Contributor does not allow comments on their photos.
Link to this page:
http://www.rrpicturearchives.net/showPicture.aspx?id=2055384