Aspect - Slow Approach #1  Contributor's Pick!       
The Valley Interchange Signal has changed its Aspect from Stop to Slow Approach-Two Steady Red over Flashing Amber/Yellow, NORAC Rule 288, Proceed prepared to stop at the next signal. Slow Speed applies until entire train clears all interlocking or spring switches, then Medium Speed applies , This is one of a few shots fo this signal aspect.
Date: 7/2/2024 Location: Bound Brook, NJ   Map Show Bound Brook on a rail map Views: 6 Collection Of:   Steve Coraggio
Author:  Steve Coraggio
Aspect - Slow Approach #1
Picture Categories: Scenic,RollingStock,Yard,Signal,Track,Action This picture is part of album:  MA -2 Catches Me By Surprise and Works Bound Brook Yard
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=2135400951