Where's the track?         
More single tracking after 23 years? No rather the bridge was being replaced to raise the clearance on US 202 & MA 10 from 11'5" to at least 14'. They rebuilt track 2 first and then #1. The tracks are about 3 to four feet higher through here.
Date: 12/6/2008 Location: Westfield, MA Views: 80 Collection Of:   Bob Beaumont
Author:  Bob Beaumont
Where's the track?
Picture Categories: Bridge,Track This picture is part of album:  CSX: BOSTON LINE
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=2171161