A lot of work is being done along the old EL.  Contributor's Pick!       
I finally was ablb to get some answers. The concrete to the left will be fitted with track and the track to the right will be done next year. The concrete track bed has pilings 8 ft deep under it. This section of the EL is tupported by a retaining wall shown in other pictures in this album. It was decided not to add to the existing wall, but rather stabilize the track structure. All this work is part of the National Gateway Project. When completed, CSX will finally be able to run double stacks on the New Castle Sub.
Date: 10/27/2010 Location: Kent, OH Views: 179 Collection Of:   Fred Stuckmann
Author:  Fred Stuckmann
A lot of work is being done along the old EL.
Picture Categories: Track,Action This picture is part of album:  Kent is getting a new bridge.
Share
User Comments
Name Type Comments Date
Bernie Feltman General Nice photo - great caption 11/2/2010 10:12:20 AM
Olaf Junges General Interesting track, a lot of rails! 11/3/2010 4:27:42 PM
Robert Farkas General Great photo, but "HOW SAD"!!! 1/18/2011 6:21:02 PM
Fred Stuckmann General Thank you. 1/18/2011 6:23:16 PM

Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=2285596