The bridge handles just two tracks. Here there are 4. From the staton platform the 1st one with wood ties handles MARC and low speed Amtrak. The two center tracks are the high speed mains with concrete. The far track is the lead into the Amtrak MOw facility about a mile north from this point. /DL |