Up on the Bridge         
Riding on track 2 on the Warehouse Pt bridge. Track 1 is currently disconnected and not used in revenue service. Instead track 1 is now used for maintenance.
Date: 8/18/2003 Location: Warehouse Point, CT Views: 79 Collection Of:   Bob Beaumont
Author:  Bob Beaumont
Up on the Bridge
Picture Categories: Bridge,Track,Action This picture is part of album:  AMTRAK: SPRINGFIELD LINE
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=2419149