Phase 1         
Track #2 ripped up.A total of three power switches will be installed this weekend with one cut in service on track #2 to the framingham secondary.
Date: 6/1/1983 Location: Framingham, MA Views: 320 Collection Of:   Robert J. Grubinskas
Author:  Philip M. Paradis
Phase 1
Picture Categories: This picture is part of album:  Framingham,MA. The removal of the diamonds'.
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=274454