A part of the plant can be seen to the right. We had to switch BFG on the night of the Blizzard of 78. It was so bad by morning that we locked the engine inside the plant and were transported back to Pennsy's South Akron Yard by our Trainmaster. It would be 3 days before the rr ran again. |