The conductor sets the coupler before approaching the switch that needs to be aligned. |
Date:
11/11/2011 |
Location:
East Chicago, IN |
Views:
216 |
Collection Of:
Gary Everhart |
Locomotives: |
Author: Gary Everhart
|
|
Picture Categories: Roster,RollingStock,Track,Action |
This picture is part of album: Gondola Pick Up at the Steel Mill |