Interesting how concrete was poured around the original steel girder frame.
As the contractor demolishes the concrete outer shell (to the right in the picture), the original steel construction is exposed.
Date:
1/15/2012
Location:
Shreveport, LA
Views:
596
Collection Of:
Bryce Denny
Author:
Bryce Denny
Picture Categories:
This picture is part of album:
Shreveport Depot St. Yard Constructioh 2011
Share
User Comments
No Comments on this picture
Add a Comment:
Please
Log in
to leave a Comment.
Link to this page:
http://www.rrpicturearchives.net/showPicture.aspx?id=2875072