Phase 1         
Installing new switch from #2 track to framingham secondary.
Date: 6/1/1983 Location: Framingham, MA Views: 365 Collection Of:   Robert J. Grubinskas
Rolling Stock: CR 93004 (MofW Equipment) CR 532867 (Gondola) Author:  Robert J. Grubinskas
Phase 1
Picture Categories: RollingStock This picture is part of album:  Framingham,MA. The removal of the diamonds'.
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=288897