Rail traffic is about to be suspended. Pittsburgh East was running trains at slow speed thru the area and advising trains that Alto signals were dark and to ignore the new CP Altoona aspects. No cutting of the bridge structures had commenced at this time. It is 11:47am. /DL |
Date:
6/16/2012 |
Location:
Altoona (CP ALTO), PA |
Views:
134 |
Collection Of:
David Larrabee |
|
Author: David Larrabee
|
|
Picture Categories: Yard,Signal,Track,Action |
This picture is part of album: Alto's Signal Bridges |