Fine tuning the cables.         
Rail traffic is about to be suspended. Pittsburgh East was running trains at slow speed thru the area and advising trains that Alto signals were dark and to ignore the new CP Altoona aspects. No cutting of the bridge structures had commenced at this time. It is 11:47am. /DL
Date: 6/16/2012 Location: Altoona (CP ALTO), PA Views: 134 Collection Of:   David Larrabee
Author:  David Larrabee
Fine tuning the cables.
Picture Categories: Yard,Signal,Track,Action This picture is part of album:  Alto's Signal Bridges
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=3069873