With additional power added at Abrams Yard, NS 9341 lays down the sand to bring 520 loaded ore train up the grade on the Morrisville connecting track while approaching CP King. After clearing the interlock, the train will be backed into the Dale secondary to be tied down. |
Date:
7/7/2012 |
Location:
Plymouth Meeting, PA |
Views:
75 |
Collection Of:
Joe Benedict |
Locomotives: |
Author: Joe Benedict
|
|
Picture Categories: Action |
This picture is part of album: 2012 pics Philadelphia & vicinity |