This is the south end of a 9 mile double track section on the Fitzgerald sub. Q101 has pulled up to the signal on the south end awaiting a northbound. |
Date:
7/11/2012 |
Location:
Rupert, GA Map  |
Views:
321 |
Collection Of:

Bryan Smith |
|
Author: Bryan Smith
|
 |
Picture Categories: |
This picture is part of album: Georgia Railroading |