Hydraulic Lifts Shifting the Load
After passing under the Camp Meeting Avenue Bridge, technician starts the hydraulic lift generator to slowly shift the load back to its "original" position. 0958 hours.
Date:
7/22/2012
Location:
Skillman, NJ
Views:
272
Collection Of:
Kim Piersol
Author:
Kim Piersol
Picture Categories:
This picture is part of album:
Air Products 100th Heat Exchanger Move
Share
User Comments
No Comments on this picture
Add a Comment:
Please
Log in
to leave a Comment.
Link to this page:
http://www.rrpicturearchives.net/showPicture.aspx?id=3116786