This view from the Linwood Street overpass shows tbe northwest end of the construction. The old grade that is being replaced is the "high line." The new grade is down below, and is reportedly going to be double tracked. You can see the base of a bridge that was removed to the left. You can see why'they would want to replace the stiff grade on the line currently in use. |