Looking northeast towards downtown Shreveport, the KCS construction project continues.         
One would hardly recognize this area from one year ago. The big cut is where the new double track line to connect with the KCS double track line through the Texas Street cut is being located. The line to the far beft is a temporary track, located generally where the actually old line into the yard (that has been removed) was. The grade to the right is where the UP local line is going to be relocated. A large retcntion pond is to the right, as shown in another picture in this album.
Date: 10/21/2012 Location: Shreveport, LA Views: 505 Collection Of:   Bryce Denny
Author:  Bryce Denny
Looking northeast towards downtown Shreveport, the KCS construction project continues.
Picture Categories: This picture is part of album:  Shreveport Depot St. Yard Constructioh 2011
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=3243285