KCS Construction in Shreveport - late December 2012         
The first of two lines in the new cut is complete, but not operating. To the right, you can see where the new UP line will connect with the new line in the cut. The temporary line (left) is still operational. I posted this photo on January 28, 2013 - and at this time the temporary line is gone, trains are operating in the cut, and the UP line has the track down.
Date: 12/22/2012 Location: Shreveport, LA Views: 382 Collection Of:   Bryce Denny
Author:  Bryce Denny
KCS Construction in Shreveport - late December 2012
Picture Categories: This picture is part of album:  Shreveport Depot St. Yard Constructioh 2011
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=3353540