The first of two lines in the new cut is complete, but not operating. To the right, you can see where the new UP line will connect with the new line in the cut. The temporary line (left) is still operational. I posted this photo on January 28, 2013 - and at this time the temporary line is gone, trains are operating in the cut, and the UP line has the track down. |