KCS Shreveport Construction Update         
The temporary track to the far left is now gone. The new cut has a single track that is operational, and a second track should be added in the next couple of months. The new track to the right is the Union Pacific connection to a local line. The north end of the "Rabbit Line" is in the far background.
Date: 1/21/2013 Location: Shreveport, LA Views: 453 Collection Of:   Bryce Denny
Author:  Bryce Denny
KCS Shreveport Construction Update
Picture Categories: Track This picture is part of album:  Shreveport Depot St. Yard Constructioh 2011
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=3354854