Black River and Western's Lehigh Valley NW1 112 and their 2-8-0 steam locomotive #60 sit outside the engine house. 112 was pulling a train with 4 cabooses, 1 parlor car, a PRR ore jenny, and a PRR flat car, to Flemington. 60 is undergoing air pressure tests. Both locomotives were built in the late 1930's. LV 112 was built for the Lehigh Valley on April 7th, 1939 and 60 was built for Great Western in September 1937. |