The conductor off this CN SB had just climbed off the lead unit to watch for clerence for the signal that was positioned alongside the rails by the crossing for this "High & Wide" load. Sure didnt look any higher than the rest and was what, 2 inches wider than the rest! Seriously?!? |
Date:
6/3/2013 |
Location:
Blue Island, IL |
Views:
292 |
Collection Of:
Dave Howarth Jr. |
|
Author: Dave Howarth Jr.
|
|
Picture Categories: RollingStock,Action |
This picture is part of album: Bulkhead's - Flat's - Centerbeam's - Woodchip's |