The piles on the left are to be loaded onto the cars. Power is staying with the train for the entire time of the loading (2-3 weeks). The location is off the Apalachicola Northern. Article about the train: http://articles.baltimoresun.com/2013-12-13/features/bal-bmg-florida-shells-to-help-revive-mds-oysters-20131213_1_coal-pier-lost-oyster-reefs-oyster-restoration-efforts |