K199 being loaded with oyster shells   Contributor's Pick!       
The piles on the left are to be loaded onto the cars. Power is staying with the train for the entire time of the loading (2-3 weeks). The location is off the Apalachicola Northern. Article about the train: http://articles.baltimoresun.com/2013-12-13/features/bal-bmg-florida-shells-to-help-revive-mds-oysters-20131213_1_coal-pier-lost-oyster-reefs-oyster-restoration-efforts
Date: 3/8/2014 Location: Telogia, FL Views: 420 Collection Of:   G Gerard
Author:  G Gerard
K199 being loaded with oyster shells
Picture Categories: This picture is part of album:  Restored Album
Share
User Comments Contributor does not allow comments on their photos.
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=3773320