Raymore, A CP CTC Control Location.  Contributor's Pick!       
The End of Nine Miles Of Double Track CTC Looking East. Single Track CTC Begins, with a Lead to a Large Frac Sand Plant to the Right.
Date: 7/4/2014 Location: Raymore, WI Views: 198 Collection Of:   Dennis Weber
Author:  Dennis Weber
Raymore,  A   CP   CTC   Control   Location.
Picture Categories: Scenic,Station,Signal,Track This picture is part of album:  Variety On the On July 3 / 4 2014.
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=3888633