Inspection Center for Newest US-Mexico Rail Crossing         
While the press announced that this new rail bridge is open (there was even a private dedication ceremony on 3-31-15) there still is another 2-3 weeks delay until trains begin daily ops here. The big hold up was who was supposed to pay to move the X-ray equip. UP and BRG refused to pay so that left the Feds and the local county squabbling over who should foot the bill.
Date: 4/5/2015 Location: San Pedro, TX Views: 57 Collection Of:   Randy Curlin
Author:  Randy Curlin
Inspection Center for Newest US-Mexico Rail Crossing
Picture Categories: Track This picture is part of album:  South Texas Apr 2015
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=4154717