While the press announced that this new rail bridge is open (there was even a private dedication ceremony on 3-31-15) there still is another 2-3 weeks delay until trains begin daily ops here. The big hold up was who was supposed to pay to move the X-ray equip. UP and BRG refused to pay so that left the Feds and the local county squabbling over who should foot the bill. |
Date:
4/5/2015 |
Location:
San Pedro, TX |
Views:
57 |
Collection Of:
Randy Curlin |
|
Author: Randy Curlin
|
|
Picture Categories: Track |
This picture is part of album: South Texas Apr 2015 |