Long stacks  Contributor's Pick!       
Conrail would not let the D&H/NYSW stack trains change crews on their main, so the trains had to pull into one of the yards. This SLN 4 is pulled down to Terrace Drive, its train stretched all the way back out to the north end. It will be a long back up move to get back out onto the Tier to go east at BD.
Date: 10/27/1988 Location: Binghamton, NY Views: 839 Collection Of:   Tom Beckett
Locomotives: NYSW 4008(B40-8) DH 7407(GP39-2) CSX 6815(GP40) CSX 6630(GP40)    Author:  Tom Beckett
Long stacks
Picture Categories: Yard,Action This picture is part of album:  NYSW operating the D&H Binghamton yards
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=4293610