Barricade set up on the Providence and Worcester track by Boston Switch tower. Temporary switch giving the Providence and Worcester access to the Amtrak Northeast Corridor was here, while this track was lowered thru Pawtucket Depot. Switch was removed with this last phase, and the grade lowered approximately 2 feet for auto rack clearance under the Sacred Heart Avenue bridge |