Freight trains to Gotthard Base Tunnel / Switzerland
A 2000 t / 4400 lbs sea container train from Rotterdam needs two Bo'Bo'Bo - Re 620 (locally called Re 12/12) to pass the Gotthard Base Tunnel at a required speed of 100 kmh / 125 mph.
Date:
4/21/2017
Location:
Oberrueti , CH
Views:
216
Collection Of:
Peider SwissTrip
Locomotives:
SBB 620(UNKNOWN)
Author:
Peider SwissTrip
Picture Categories:
This picture is part of album:
Restored Album
Share
User Comments
No Comments on this picture
Add a Comment:
Please
Log in
to leave a Comment.
Link to this page:
http://www.rrpicturearchives.net/showPicture.aspx?id=4690111