The aftermath
Work done by the MofW crew to get the load across.
Date:
5/8/2017
Location:
Cortland, NY
Views:
296
Collection Of:
Scott Crotwell
Author:
scott crotwell
Picture Categories: Bridge,Track
This picture is part of album:
A high and wide gets stuck in Cortland
Share
User Comments
Name
Type
Comments
Date
robert mungenast
General
what ever works that was ckose
5/18/2017 6:39:33 AM
Jim Ford
General
The original clearance measurement was pretty close. Neat album.
5/18/2017 7:31:08 PM
Randy Curlin
General
Interesting shot
5/18/2017 7:35:04 PM
Steve Coraggio
General
Great shot, each cut looks different to accommodate the load clearimng the bridge.
8/18/2017 9:19:35 AM
Add a Comment:
Please
Log in
to leave a Comment.
Link to this page:
http://www.rrpicturearchives.net/showPicture.aspx?id=4710478