Amtrak 63 "Maple Leaf"  Contributor's Pick!       
There was track work going on under the signal bridge at CP 308 on the CSX Rochester Subdivision. Many trains were stopped at different locations. Amtrak 63 was the first train to go through the work site at CP 308 at 10 mph. Once the Maple Leaf cleared, CSX NF Dispatcher changes all signals in the area to clear. Track workers cleared the line and left about an hour later.
Date: 7/9/2011 Location: Jordan, NY Views: 128 Collection Of:   Max Smith
Author:  Max Smith
Amtrak 63 "Maple Leaf"
Picture Categories: Roster,Scenic,RollingStock,Signal,Passenger,Action This picture is part of album:  Jordan, NY 2011
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=4993493