Left side view carrying an End Of Train device (soon to be removed by the conductor) in the Providence & Worcester Railroad yard at Plainfield, CT. Built 4/2007 by TrinityRail job 3136. 2743 cu ft cap. Length 57' 8". |
Date:
10/17/2018 |
Location:
Plainfield, CT |
Views:
32 |
Collection Of:
Leighton L. Haeseler |
Rolling Stock: |
Author: Leighton Haeseler
|
|
Picture Categories: RollingStock,Yard,Track |
This picture is part of album: ATW equipment in CT |