A CN local services Neenah Foundry Plant 2 & Plant 3 via former C&NW rails at Neenah, WI on 15 Aug. '19. Plant 2 opened in 1960 and Plant 3 was built in 1967. Plant 1 opened in 1918 and stood about a mile to the north, until it was closed in 1994 and eventually demolished. The former SOO rails run parallel at left. The W. Cecil St. overpass (Timothy Hamblin Bridge) can be seen in the background at left. The overpass, erected to eliminate the grade crossing, opened to traffic on 20 Nov. '07. |