WAITING FOR CLEARANCE  Contributor's Pick!       
MA -2 IS ALMOSYT ON THE NS LEHIGH LINE. THE SIGNAL ON THE VALLEY INTERCHANGE RACK IS BEHIND MA-2. THEY AER WAITING FOR CLWEARANCE TO ENTER THE LEHIHG LINE. AND CROS OVER ONTO TRACK 2 AND HEAR WEST.
Date: 7/11/2019 Location: Bound Brook, NJ Views: 174 Collection Of:   Steve Coraggio
Locomotives: NS 5634(GP38-2)   Rolling Stock: MLLX 98990 (Covered Hopper) Author:  Steve Coraggio
WAITING FOR CLEARANCE
Picture Categories: Roster,Scenic,RollingStock,Bridge,Signal,Track,Action This picture is part of album:  Manville 2, "The Mighty MA-2"
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=5201761