Right side view with a scrap metal load in the New England Cetral Railroad yard at Willimantic, CT. Built 3/2019 by Gunderson Concarril. 4014 cu ft cap. Length 58' 2". |
Date:
1/31/2020 |
Location:
Willimantic, CT |
Views:
61 |
Collection Of:
Leighton L. Haeseler |
Rolling Stock: |
Author: Leighton Haeseler
|
|
Picture Categories: Scenic,RollingStock,Yard,Track |
This picture is part of album: SSEX gondolas in CT |